Friday, May 8, 2009

FMO Windows Installed...Sorta!

It was another dawn to dusk day. The main construction of the forest management office (FMO) is nearly complete.

I started with a supply run for final building materials and ended by installing the three windows and firming up the blue roof tarp. The window placement and tarp are only temporary and will be adjusted (windows) or removed (tarp) in the autumn when permanent boarding and pine shakes are installed. I'll rough it until then once the door is installed tomorrow.

I'm getting a little bored with posting these construction photos. This will be the last lot of FMO photos for a while. Time to look for a paying gig.

Installed the bottom ridge board with some love taps from Baby Sledge.


Sledge hammering made for many water breaks.


The gable end plywood and sliding window is installed.


A parting photo of the exterior. And I promise to fix the loose tarp.